Menu principale:
INDUSTRIAL BUILDINGSThe whole spectrum include 20 industrial buildings.
works
Erection drawings
Assembly drawings
Bill of materials and workshop drawings
features of building
Projectline realized buidings F04, F08, F09A, F12/14, F15. Total weight 3.725.650 Kg.
drawings
back‹